Summary Report of the Pre-Bid Meeting for the ITB No: #13/2020/WSRN S-Barbados/GCF/CCCCC – Design, Supply, Installation and Commissioning of 4.5 MW Solar photovoltaic generation and 2.0 MW MicroTurbine systems

ITB No: #13/2020/WSRN S-Barbados/GCF/CCCCC – Design, Supply, Installation and Commissioning of 4.5 MW Solar photovoltaic generation and 2.0 MW MicroTurbine systems

The Pre- Bid Meeting and Site Visit was held on Tuesday March 10th, 2020 commencing 10:00 am (Barbados time) at the Barbados Water Authority Training Room Annex.

Peruse the Summary Report of the Pre-Bid Meeting.

For more information, see:

The deadline for submission of Bids was Tuesday, March 31st 2020 at 10:00 AM (Barbados Time which is GMT-4).

 


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: